Modular and Pre fabricated Structures.

Project: Staff Site Hostels
Client : Taifa Gas
Main Contractor: Vinshad
Location: Dongo Kundu Industrial Park Mombasa
Project Scope:
-Design & Shipping.
-Site Clearance & Foundations.
-Prefab assembly & Retro fitting.
-Elecrical and Plumbing works.
Land scaping and Drainages

Project: Floating Roof Demolition Kipevu Mombasa.

Client: Kpc

Location: Mombasa.

Project Scope:

  • Cutting of floating roof
  • Sectional dismantling to manageable sizes.
  • Lifting and removal using crane.
  • Safe disposal or recycling of scrap materials.

Project: Storage Tanks Bottom Rehabilitation
Client: KPC.
Location: Kipevu Oil Storage Facility KOSF – Mombasa, Kenya

Project Scope:

  • Replacement of sandbase.
  • Installation of new foundation layers.
  • Settlement correction and leveling.
  • Installation of new bottom plates annular and floor plates
  • Plate alignment and fit-up.
  • Welding of plates butt/fillet welds.
  • Installation of annular ring plates.

Project: Equipment Stringing In Progress At Birembo  Sub – Station

Main Contractor: Energy Technologies.

Sub Contractor: Damey Construction.

Location:  Rwanda.

Project Scope:

  • Installation of connectors, clamps, and fittings.
  • Bolting and tightening of electrical joints.
  • Connection of equipment to the earthing system.
  • Bonding of metallic parts for safety.

Project: Olkaria 4 Substation and Switchyards.

Main Contractor: ChintChina.

Sub Contractor: Energy Technologies.

Sub Contractor: Damey Construction.

Client: KPLC.

Location: Naivasha.

Project Scope:

  • Erection of steel structures;gantries, equipment supports.
  • Installation of busbar support structures
  • Mounting of insulators and hardware fittings
  • Installation of power transformers.
  • Installation of rigid or flexible busbars
  • Stringing of conductors between equipment
  • Installation of jumpers and connectors.

Project: Upstream Mombasa Line Exposure.
Client: KPC.
Location: Voi.
Project Scope:

  • Excavation to Expose Pipe.
  • Assessment of pipeline condition.
  • Inspection
  • Material compatibility checks.

Project: Painting works at KPC’s Storage tank.

Client: KPC

Location: Mombasa.

Project Scope.

  • Scaffolding and Screening.
  • Grit Blasting.
  • Application of anti-corrosion primer.
  • Application of build-up coating layer.
  • Topcoat Application.

Project: ERECTION WORK (EQUIPMENT) FOR 132kV KISUMU SUBSTATION UNDER OLKARIA – LESSOS – KISUMU TRANSMISSION LINES CONSTRUCTION PROJECT: LOT 3

Main Contractor: Sieyuan Electric From China

Sub Contractor: Energy Technologies.

Sub Contractor: Damey Construction.

Client: KETRACO.

Project Scope:

  • Bay layout design and extension planning.
  • Site clearing and extension of switchyard area.
  • Foundations for new equipment (breakers, CTs, VTs, structures)
  • Cable trenches and duct extensions.
  • Drainage and yard surfacing.
  • Extension of existing busbar systems.
  • Stringing of conductors and jumpers.
  • Installation of connectors and clamps.
  • Extension of control and protection cables.
  • Cable laying, termination, and gland installation.
  • Integration with existing control panels.
Product Line Rehabilitation

Project: Product Line Rehabilitation

Year: 2022-2023

Location: PS 12 Moi International airport Aviation Depot

Project Scope:

  • Ultrasonic thickness measurements (UT)
  • Corrosion and defect assessment.
  • Leak detection and integrity evaluation.
  • Replacement of damaged or corroded pipe sections.
  • Weld repairs and reinforcement.
  • Fit-up and welding of new pipe sections
  • Non-Destructive Testing (NDT) of welds
  • Joint integrity verification.
  • Coating and Corrosion Protection

Project: DOME ROOF INSTALLATION MOMBASA TANK FARM 

Location: Mombasa.

Client: KPC.

Project Scope:

  • Preparation of fabrication and installation drawings.
  • Inspection of existing tank shell and top ring.
  • Verification of tank dimensions and tolerances.
  • Installation of temporary supports/scaffolding.
  • Installation of compression ring or support structure
  • Assembly of dome framework triangular panels/sections
  • Bolting and welding of structural members.
  • Ground assembly and lifting (crane method)
  • Installation of roof panels or sheets
  • Sealing of joints to ensure weatherproofing

PROJECT: CONDUCTORING OF 132KV LINE TO THE TERMINAL TOWER AT THE NAIVASHA SUBSTATION.

Main Contractor: AEE AS (SPAIN)

Sub Contractor: Energy Technologies.

Sub Contractor: Damey Construction

Location. Nakuru County.

Project Scope.

  • Route survey and verification of tower readiness.
  • Inspection of tower structures, insulators, and hardware fittings.
  • Installation of stringing equipment, tensioners, pullers, rollers.
  • Fixing of running blocks pulleys on towers.
  • Pulling of pilot rope and replacement with conductor.
  • Tension stringing of conductors to required sag levels.
  • Adjustment of conductor sag as per design specifications.
  • Installation of suspension and tension clamps.
  • Fixing of spacers, vibration dampers, and other fittings.
  • Installation of jumper connections at the terminal tower.

PROJECT: NAIVASHA SUBSTATION 132KV

MAIN CONTRACTOR: AEE SPAIN.

Sub Contractor: Energy Technologies.

Sub Contractor: Damey Construction

Location: Naivasha.

Project Scope.

  • Engineering & Design
  • Civil Works
  • Structural Works
  • Electrical Equipment Installation (132kV)
  • Busbar and Equipment Stringing.
  • Cabling Works.
  • Protection, Control & SCADA Systems.
  • Installation of protection relays and panels.
  • SCADA system integration.
  • Earthing & Lightning Protection.
  • Testing & Commissioning.
  • Energization and commissioning of substation.
  • Integration and Grid Connection.
  • Tie-in with transmission lines 132kV lines
  • Health, Safety & Environmental.

Installation Works of Olkaria V and OHL

Client: Kengen

Main Contractor Sieyuan Electric CO LTD

Sub Contractor Energy Technologies Ltd

Sub Contractor Damey Construction Company Limited.

 

PROJECT SCOPE.

Installation works for the Olkaria IV high-voltage substation.

-Installation works for the associated overhead transmission line (OHL).

-Execution under Lot 3 of the Olkaria V Geothermal Power Plant High-Voltage Substations and Transmission Lines Project.

 

Project: Installation, Testing and Commissioning Sub station DC Battery Chargers 220V, 110V, 48V and Instrumentations.

Our Projects: Dome Roof Assemble for Tank 201.

Client: KPC Location: Mombasa.