Project: 14-TK- 501 Rehabilitation Year: 2024 – Ongoing Location: Kipevu Oil Storage Facility (KOSF)
Project: Product Line Rehabilitation Year: 2022-2023Location: PS 12 Moi International airport Aviation Depot
Project: Painting works at KPC’s Storage tankYear:2021- 2022Location: Mombasa
Project: Steel Fixing at Hoima City Stadium
Year: 2024-Ongoing
Location: Hoima Town, Uganda.
Project: Aluminum Geodesic Dome Roof Installation Year: 2024-OngoingLocation: Kipevu Oil Storage Facility (KOSF) – Mombasa, Kenya.
Project: Tank Demolition and decommissionYear: 2022-2023Location: Vivo Storage Facility Dar-es-Salam, Tanzania.
Project: Corrosion control at Tullow Oil Storage TanksYear: 2018- 2020Location: Turkana Crude Oil Field.
Project: Prefab Container Construction at Taifa Gas PlantYear: 2025- Ongoing Location: Dogo Kundu Special Economic Zone (SEZ)
Project: Storage Tanks Bottom Rehabilitation Year: 2024- Ongoing Location: Kipevu Oil Storage Facility KOSF – Mombasa, Kenya.